About us
About us
Gerpon is mainly dealing in producer and wholesale of all kinds of wear parts and special steel product at home and abroad.
Production Equipment
Production Equipment
Precise heat treatment of quenching, tempering and normalizing could make the steels in a perfect c..
Company Culture
Company Culture
Unity, hard work, realistic, innovative
Company  news
Company news
Industry News
Industry News
Inspection equipment
Inspection equipment
Separated quality testing department equipped advanced equipment
Quality control process
Quality control process
Quality control process
Wear parts
Wear parts
Widely used in foundation drilling,coal mining industry,geotechnical engineering,etc.
Global market
Global market
Domestic market
Domestic market

News

Location:Home > News

Leagold describes Los Filos expansion

2019/3/16 11:36:55

mexicos-mining-sector-to-reach-17-8bn-by-2020-on-zinc-prices-strong-pipeline.jpg

Vancouver-based Leagold Mining Corp. has filed the feasibility study for expanded facilities at the Los Filos gold complex 180 km south of Mexico City. The project currently consists of the Los Filos and Bermejal pits and the Los Filos underground mine.

The study outlines development of the Bermejal underground mine, enlarging the Los Filos open pit, creating two distinct phases for the Bermejal pit (Bermejal and Guadalupe), construction of a 4,000-t/d carbon-in-leach (CIL) facility to complement the existing heap leach facilities.

The expanded Los Filos project will have a 20-year mine life (2019-28) during which time 3.2 million oz. of gold will be recovered at an anticipated all-in sustaining cost of $740/oz. Beginning in 2021, the average annual output will be 350,000 oz. at an AISC of $694 per oz. That number will rise to 420,000 oz. going forward until 2024.

The largest part of the $180 million will be developing the Bermejal underground and the CIL plant with related infrastructure.

Leagold used a price of $1,250 per oz. of gold to arrive at a net present value (5% discount) of $679 million and an internal rate of return at 86%. The expanded project would also boost net cash flow to $884 million.

The expansion project would mine proven and probable reserves that host a total of 4.4 million oz. of gold. The open pit portion is 95.9 million tonnes grading 0.88 g/t gold, and the underground material is 8.3 million tonnes grading 1.69 g/t gold. The company also counts about 114,000 oz. of recoverable gold in the leach pad inventory classified as an additional probable reserve.


Contact us

Gerpon(shandong) Machinery Co.,Ltd.
Add:Dongchang east road,Liaocheng ETDZ, Shandong Province, China

+86-0635-2929887
E-mail:sale@gerpon.com
Copyright 2015-2016 www.gerpon.com .all right reserved  Gerpon(shandong) Machinery Co.,Ltd.  鲁ICP备16014369号